Deluge Valve Overhauls

Clearwater carry out routine testing and overhauls of many types of typical deluge valves and TRIM panels.

All our personnel are fully conversant and experienced on Tyco BW Series, Reliable, Angus, GEM Multimatic, Bermad, Tyco DV-5, Chubb C300 and Inbal deluge valves.

All valves can be overhauled in our Aberdeen workshop or on site offshore and each stage of the detailed process is recorded to form part of the close out report.

Each valve is checked on delivery to our workshop prior to the following work being carried out:

  • Complete strip down of all components
  • Vapour blasting of all external parts
  • All soft rubber components changed out
  • Detailed inspection of each component for wear/damage
  • Repainting of components where required
  • Reassembly of valves as per manufacturers recommendations and specification
  • Bench testing of the pilot and actuator assembly

In addition to the above Clearwater are one of the only companies within the UK who can fully flow test and factory set up elastomeric deluge valves to the design specifications in the hydraulic calculations. Each valve following overhaul can be set up and the flow and pressure parameters set up to the hydraulic model requirements. This option is often more attractive for offshore operators as it negates the requirement for a full wet deluge test when the valve is changed out offshore.